HealthCare | |
Cedars Medical
Center | |
Profile-Commercial | |
Profile-Specialty | |
· HVAC Load Study of the facility, replace main heat
recovery wheels at main air distribution units 50,000 cfm each. Air quality control study and out side
air intake.
· Lighting study for the entire hospital facility. Design energy efficient replacement
light fixtures. Negotiate rebate
with FPL.
· Central Plant Evaluation – Study of the central plant’s
cooling capacity and hydraulic distribution with recommendations to improve
equipment and distribution efficiency. Replacement of 400-ton
chiller.
Cedars Medical Center
Miami, Florida